To start the installation of a siding board pre drill holes above each furring strip with a 1 8 drill bit.
Drive a 3 stainless steel screw through the 1 8.
Screw and plug method.
Drive a 3 stainless steel screw through the 1 8 pre drilled hole in the last step.
Recommended two per joist.
Gorilla brand glue epoxy etc plugs are then knocked off with a chisel and sanded smooth.
Ipe siding installation apply a vapor barrier to the wall.
Attach 3 4 furring strips over the vapor barrier every 16.
Ipe shiplap siding installation process to protect from excess moisture apply a vapor barrier to the wall attach 3 4 furring strips spaced over 16 to the vapor barrier starting at the bottom start the installation of siding by pre drilling holes above each furring strip with a 1 8 drill.
To start the installation of a siding board pre drill holes above each furring strip.
3 8 ipe plugs are then glued into the holes with waterproof glue i e.
Start at the bottom of the wall.
Finish screw method stainless steel 8 trim head screws are screwed into the face of the decking.
If ipe plugs are going to be used to conceal this initial fastener then a 3 8 drill bit should be used to make a hole for each ipe plug to fit into.
Screw the deck boards down with stainless screws.