Space nails every 12 in.
How to install roof drip edge flashing.
Drive the nail through the drip edge into the roof surface not through the fascia.
Make sure to support the long end of the cut if you let it fall after cutting it will bend down and kink the drip edge.
Select enough lengths of.
Lift the shingles and slide the top flange of the drip edge underneath.
How to install drip edge flashing to a new roof.
Measure the length of the eave you need to cover with drip edge using a tape measure.
How to install drip edge and step flashing 1.
Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge.
Along the rake edges of a roof install underlayment before applying drip edge.
You may need to nail through the starter strip into the drip edge.
Regardless of how you layer the drip edge and roofing underlayment drip edge needs to be nailed into sheathing using standard roofing nails.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
Start with the ice barrier in climate zones prone to ice damming code requires that a self adhering ice barrier.
How to install drip edge flashing on a roof step 1.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Add the drip edge while it may be a common practice to install drip edge tight to the fascia silva advocates for a.
Slide the corner tight to the fascia.
Be sure to tuck the drip edge under the starter strip and felt paper.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Install the drip edge by fitting it on the roof eave pushing it tightly against the edge of the plywood and.
Start the installation at the lower edge of the roof and work your way up toward the peak.