Some panels have pre drilled holes.
How to install suntuf roofing panels.
Install the sheets without stress that is.
Install panels with the label side facing up toward the sky sheet corrugations at each side will then facedown.
Wear hearing and eye protection.
This will ensure that the uv protection layer is on the side facing the sun.
Angle grinder 1 x research source the fastest option.
If yours do not.
Most panels come up to 32 feet 9 8 m in length.
Screw every other corrugation along the bottom purlin.
For roofing applications fasten through the crests.
If you are using psp s galvanised or stainless steel diy fixings ensure that you pre drill a 10mm size hole.
Allow for a minimum of 18 inches 46 cm if you need to lap to complete the run.
If you ve got a pergola attached to your house then you might want to give yourself some extra shelter and protection from the weather simply by installing.
Installation video of suntuf rooflights the industrial polycarbonate skylight panels.
Step 1 cut the panels to the desired length.
If you want to save time use psp supadrive multi this fixing pre drills the 10mm hole and fixes the suntuf sheets to your roofing structure in one process.
Install the first sheet screwing along the lower gutter purlin from the outside barge side towards the middle of the structure.
Easily with no cracking or splitting the panel ends.
Quick video showing how you can cut corrugated roofing panels like palram s palruf suntuf and suntop.