If installing a two layer torch down roof this is the final layer of rolled roofing material the contractor will apply.
How to install torch on roofing felt.
Installing the torch down roofing involves flames and melted asphalt.
You will be placing the second layer of felt over this.
It s best to start nailing in the center and work out from there.
When considering how to felt a roof torch on felt the second layer is also an underlay felt but is bonded to the first layer with adhesive.
These thick layers of roofing felt are installed by heating the back of the felt with a butane torch and then carefully applying it to the roof.
Choose heat resistant gloves and boots made of a material like kevlar.
Thank you for watching this video.
Torch down step by step some trick and tips on how to lay down a torch down roofing.
Subscribe and share.
You will need to use your gloves and boots on occasion to roll or press down on the bitumen sheets as they bubble.
Also cover up with long sleeved clothing to reduce the chances of an accident.
When laying this layer avoid having joints in the felt at the same place as on the first layer so it can be best to start sizing with a half width of a roll to achieve this.
Hold the gun at a 45 degree angle with the nozzle pointed downwards.
There needs to be an overlap in the felt to help increase the water tight quality.
Hope you like it.
Taking the time to properly prepare the sheathing will make all the difference in how quickly and easily the felt paper is installed.
Pull the trigger of the gun and move the nozzle around the circumference of each nail.
Paint a thin layer of adhesive over the first felt layer.
If installing a three layer torch down roof the contractor will install a third layer with a granulated surface in the same way.
Installing the roofing felt does take care but can go very quickly.
If you liked this video please like and subscribe for more roofing content.
How to torch a roof.
Ensure the felt remains even and straight as you work.