A great tutorial on how to cut install vinyl siding using just the side track saw table ordinary stanley knife shows cuts around top bottom of a windo.
How to install vinyl siding on a peak.
As an alternative installation of specific types of drop in contoured foam underlayments for various styles of vinyl siding are available.
Holding the siding panel under the window mark the width of the opening on the panel allowing 1 4 in.
Next measure and cut the siding to fit the measurements of your soffit and push each panel into the j channel.
Some manufacturers of vinyl siding do not recommend the use of drop in backers with certain vinyl siding configurations.
You need to leave at least 1 4.
To install vinyl siding to the soffit and fascia area on your home nail lengths of j channel along the inner edge of the fascia leaving the nail heads out about 1 32 to 1 16 of an inch.
To provide a common reference point measure up 8 in.
From the top of this row and stretch a string line across the deck.
Whatever your measurement is take at least 1 4 or 1 8 on both sides for the panel to slide back and forth.
The bottom of the starter strip the part the bottom panel hooks on to should be at least 1 in.
Clearance below the sill.
Next lock a scrap piece of siding into the panel below butting against the window.
Below the top of the foundation but the lower the vinyl siding is installed the better.
If you don t cut your siding short when it expands in the summer it s going to buckle.
Mark the height needed allowing 1 4 in.
Attach j channel trim strips around windows and doors and along the eaves.
Use the wider starter strip.
Vinyl siding must never be applied directly to studs without sheathing.
Nail the starter strip to the siding aligning the top of the strip with the chalk line.
Nail vertical vinyl corners to the corners of the house making sure they are plumb.
It protects the sheathing from rain snow and pests.
When cutting vinyl siding it s usually to go into a corner.