Always start laying tiles from the side of the roof.
How to lay roofing tiles.
Now lay the second layer over the first layer of tiles packing the tiles in a compact manner.
Repair and reinforce the roof if applicable.
Installing tile roofs can be a challenge.
Install the tiles toward the center of the ridge from end to end and install half the number of ridge tiles.
It stops water from getting through to the roof at.
The number one rule of thumb is to make the structure water proof before the tile is installed.
Lay a course of tiles along the eaves setting the tiles at the average linear coverage.
Position the first.
How to tile a roof if you would prefer to read how to tile a roof and see more help please visit this link unless you found this video via my website.
At this stage some adjustment in shunt could be made if necessary to allow a 38 to 50mm overhang at verges.
Ensure verge overhang is equal at left and right ends.
With the joints between them aligned with the centre of the tiles above and below and with about 3mm between the sides.
Work from the opposite end and install the remaining tiles to the center of the ridge.
The next most impor.
Arrange the shingles so the ends and the.
Remove old roofing if applicable.
A key tile installs at the center of the ridge with mortar.
Start at the second tile at one end of the ridge.
You should have reinforced the frame of the roof earlier before.
Use the nail hole in each tile to nail them to the battens or if you want your tiles more secure use as many as 4 nails in each tile.
After laying the first layer secure each tile with a nail.
Start at the bottom of the roof and work left to right in rows.
Once you move onto the second row of tiles position them so that the seam of two tiles is centered in the middle of the tile below.
Mark the position along the eaves and top battens of every third tile.
Install shingles from the lower left corner working to the right and also working up the roof slope.
Install the starter strip which is just a backing for the first visible row of shingles.
Hammer each nail into the center of the contoured edge of the tiling that is easily identifiable.