Step 5 secure ends.
How to nail down roofing felt.
Use 1 inch nails for new roofing.
Dry the roof surface.
Step 1 prep the area.
Where a roll ends and a new one is begun the two rolls should be overlapped by four inches.
Hammer nails into the rolled roofing to secure it.
Cut this piece of roofing to an 18 inch width with a utility knife.
Valley ridges and hips should have a 6 inch overlap of paper.
Ensure that you hammer the nails properly into the roof don t leave the nails sticking up above the layer.
Use a trowel to spread roofing cement over half or more of the strips.
In roofing one square equals 100 square feet.
Apply drip edge to the eave.
The paper should then be nailed in or stapled every three to four inches across.
Step by step guide on how to apply bituminous roofing felt to your shed roof.
Includes useful advice on the best materials to use together with information.
All nails and staples should be placed on the lower half of the paper.
An underlayment of felt roofing is optional.
Cut drip edge flashing at an angle at the corner press it lightly against the eave end.
How to install roofing paper.
Cleaning and preparing your roof 1.
Step 2 roll it out.
Grab loose pieces of felt and pull them off the roof.
Place this roofing material so it straddles the valley.
Remove old felt from the roof with your hands and a putty knife.
Gently scrub the roof using a bristle.
Overlap and cut drip edges.
Tack it in place at the corner with the end flush with the end of the roof and the bottom edge of the roll right along the bottom of the roof deck over the drip edge.
Apply and attach drip edge.
Clean the decking as well as.
An assumption is made all materials are ordered based on the necessary measured requirements.
They are long enough to penetrate the sheathing.
Make sure you use a strong hammer and 1 inch 2 5 cm roofing nails.
Nail the roofing in place with short roofing nails spaced 6 inches apart.
How to do it.
You will need 1 10 gallon of lap not mastic cement for every roll and 2 pounds of roofing nails for every square.
If you have a sloped roof cut strips of roofing 9 inches wide position them flush with the drip edges along the eave and rake and attach them by driving two rows of nails that are about 3 inches apart.
Roll out about 10 feet of.
Hammer the nails in at 10 inches 25 cm intervals across the roof.