Vinyl siding must be nailed so expansion and contraction are not restricted.
How to properly nail vinyl siding.
Leave a minimum of 1 4 6 4mm clearance at all openings and stops.
Find the tight nails and cut them photo 4.
Allow a 1 4 in.
Keep your nails straight and give your vinyl siding a little room to breathe and you should be covered for the next 20 to 40 years all for the price of a little elbow grease.
Install lengths of j channel along the inner edge of the fascia.
Do not install vinyl siding over.
Scrape off loose caulk and re caulk around windows doors and other areas to protect from moisture penetration.
Gap for expansion wherever siding butts accessories.
Nail j channel pieces under the fascia.
Siding the soffit and fascia area 1.
Understand how to deal with wrap around soffit.
Gap between the nailhead and the vinyl to allow easy movement.
Remove all protrusions such as gutters down spouts and.
When installing in temperatures below 40 degrees f increase minimum clearance to 3 8 9 5mm.
Renail right next to the old nail leaving at least a 1 16 in.
Have the necessary tools for this diy project lined up before you start you ll save time and frustration.
Measure and cut the soffit.
Re siding nail down loose boards of existing siding and replace any rotten ones fig.
Ideally nails should go in about 1 32 of an inch from each panel s edge although you should read the manufacturer s guidelines for the proper measurements.
Required tools for this project.
If the soffit on your house wraps around a corner you will need to.