When laying the shingles for the top row cut 6 inches 15 2 centimeters from the first shingle in the left corner of the roof using the utility knife.
How to put down roofing shingles.
Lay the next row of shingles directly on top of the first row making the row two tiles thick.
Inspect the underlying roof sheathing for damage and make any needed repairs.
Start from the top of the roof and remove the old shingles along with the flashing underlayment and vents.
All the other patterns work in essentially the same way offsetting.
Install a layer of roofing insulation as recommended by the roofing manufacturer.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.
Hammer down any large nails that are exposed by the removal.
Ask this old house general contractor tom silva reveals the best ways to secure shingles to a roof.
See below for a shopping list tools and steps subscr.
How to do it remove caps.
Use sticky back ice and water shield as underlayment where ice dams or leaf and twig dams are likely to build up and at.
Remove air vents and pipe flashings by prying out or unscrewing the fasteners holding the fixture.
You ll get the most life out of your shingles and your roof by laying them in a smart.
Using alternate patterns 1.
Use a flat pry bar.
If a shingle is.
Pull the drip edge down about a half inch from that line to create a gap between the drip edge and the fascia board.
Continue to chalk additional guidelines based on the width of the shingle through at least four courses rows across.
Consider four and five.
Understand the basic patterns.
Remove the ridge caps.
Using the chalk line snap a line between the two marks to get a straight edge.
To start installing shingles line up aluminum drip edge flush with the edge of the roof and make a pencil line at the top on each end of the house.
Place a whole shingle next to it.
Many pros shingle in a vertical line up the roof because it s much faster.
Doing it now will make it easier to keep the reroofing job clean.
Nail down the shingles as you go along.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.