Remove old shingles and.
How to put shingle roof.
This will help determine how the shingles will lay on the.
Preparing the roof 1.
Adhere the joint where the cut edges of the shingles meet the dome.
Get the right number of shingles for the job.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.
Understand the physics of how a sloped shingle roof works.
Lay the lower edge of the flange over the top of the lower shingles and the upper edge is positioned underneath the.
To start installing shingles line up aluminum drip edge flush with the edge of the roof and make a pencil line at the top on each end of the house.
Starting at the bottom of the roof map out a guideline with chalk.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
Using the chalk line snap a line between the two marks to get a straight edge.
Cut the shingles to fit around the flange s dome.
Continue to chalk additional guidelines based on the width of the shingle through at least four courses rows across.
Step one in any roofing project is always safety first.
Working at heights on a roof presents fall hazard risks and.
Pull the drip edge down about a half inch from that line to create a gap between the drip edge and the fascia board.
Adhere the shingles adjacent to the flange with roofing tar.
Many pros shingle in a vertical line up the roof because it s much faster.
Asphalt roofing shingles simply rely on the force of.