They are long enough to penetrate the sheathing.
How to put up rolled roofing.
How to do it attach first course.
Before you start to fix it you must check its integrity.
Do not use the eaves as a guide instead because they can be uneven.
For this heat up the gas burner and push it to the edge of the site where it will be fixed.
Snap a chalk line as a guide for the first layer roofing.
Step 6nail the first course match the overhang to the overhang of the starter strip 1 4 to 3 8 from the drip edge.
Fix edge fabric roll.
Make sure the roofing material is laying flat with no bumps or wrinkles attach the upper edge with the large head.
Plan so that no two butt joints are closer than 2 feet from each other.
The roll is unwound and laid on the site of the future installation.
Use 1 nails for re roofing.
Make sure the rolled roofing is parallel to the eve of the roof.
Valleys will be open so flash them before hand with metal or two layers of roll roofing the first an 18 inch wide strip and the second 36 inches wide.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
How to apply roll roofing laying begins at the lowest point.
To seal a plumbing vent spread roofing.