A house attached patio roof takes advantage of the house s structure by supporting one end of the roof on a ledger mounted horizontally to the house.
How to roof a house yourself.
If the gaps lined up water could get directly onto the roof sheathing and then seep in through a nail hole.
Before you can begin to update your roof you will have to get an accurate measurement and order your materials.
Cover the roof above the underlayment with roofing felt paper.
In this video this old house general contractor tom silva explains how to reshingle a roof.
Check with your local government agency regarding the need for a building permit before.
Pry off old roof shingles with pitch fork.
How to roof a house cover the roof with felt paper.
Roll on the felt paper.
Step 5 install.
First measure the length and width of one section of the roof then measure the distance the roof rises from the lowest point to the highest point.
Choose an appropriate kind of.
10 steps to roofing a house 1.
Cover roof deck with 30 pound felt underlayment.
If you need more than one flashing in.
Learn your local building codes regarding roofs.
At this point you should have a completely debris free roof.
Many building codes regulate the number of layers of shingles that.
Cover underlayment with tar.
Step 4 install water guard.
Arrange the shingles so the ends and the tab notches do not lie directly above gaps in the shingle below.
If not you can always use your.
Size up your roof to find out how many shingles tarpaper and other materials you need.
Measure the vertical distance rise from the 12 inch mark on the level run to the underside of the same rafter.
The first step is perhaps the most obvious one you have to strip the old roof clean in.
Step 2 strip your old roof.
Install self stick underlayment under the metal flashing.
Roofing a house in 7 steps.
Obtain any necessary permits.
Locating and mounting the ledger is normally a fairly easy process.
Step 3 replace or re nail your sheathing.
Measure the length width and rise of one section your roof.
Slope is calculated as rise over run.
The ledger should be attached before the foundation is built for a deck patio roof posts and other structure.
Remove the old roof.
Staple felt every 6 to 8 inches.
Step 1 plan your job.
Study your structure and take.
Figure out the slope of the roof by setting a carpenter s level on the underside of one rafter in the attic.
Nail down loose roof sheathing to rafters.
Install shingles from the lower left corner working to the right and also working up the roof slope.