You will once again need 4 nails whenever you are installing the 3 tab shingles.
How to shingle a 3 tab roof.
Make sure that the tabs are lining up with the bottom line and that the tabs are facing down.
Nail the shingles with no tabs such as precut pro start shingles and apply asphalt cement from a caulk gun in many.
Drive a nail at one end first then drive the others.
Starting at the bottom of the roof map out a guideline with chalk.
To attach a 3 tab shingle align it with the layout line and drive nails 1 2 inch above the cutout slots including the half slots at each side.
Continue to chalk additional guidelines based on the width of the shingle through at least four courses rows across the roof.
Install the drip edge over the gable end felt and under the eaves felt.
Many pros shingle in a vertical line up the roof because it s much faster.
Roll out and staple down roofing felt in overlapping rows.
How to shingle a shed with 3 tab and architectural shingles.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
Instead of cutting off all three tabs you can also reverse the shingles for a starter course so that the entire.
Video 13 how to install 3 tab asphalt roofing shingles on the shed our shed plans if you would like to get our shed plans please choose from the sizes below for more details.
Step 2 determine the prevailing wind pattern for the area.
Cut the necessary number of pieces for the ridge cap from the 3 tab shingles.
Attach the starter strip nail down the shingles in an overlapping pattern that covers seams and nails.
If you are using a power nailer drive nails by squeezing the trigger and bouncing the nailer s tip onto the shingle.
The first full shingle that you lay will need to be laid along the centerline of your roof.