Slide a new roof jack sized to fit your vent pipe.
How to shingle around roof jacks.
Remove any roofing nails and slide out the shingles.
Open valleys have metal flashing to protect this critical area of the roof.
Until you have worked a good deal with roof jacks leave any roofing project higher than one story to a professional contractor.
How to use roof jacks step 1.
I came across this steep roof and took this video about installing the roof jacks and the board before installing the roofing materials.
To replace a damaged roof vent jack on your home.
Set the first shingle of the second row back a half tab 6 inches 17 centimeters from the edge of first shingle on the first row and so that the bottom of its tabs just touches the tops of the cutout slots on the shingle below.
The edge of the roof has thin metal flashing that helps water drip off the roof without damaging the home or causing a leak.
Attach jack image zoom roof jacks provide a stable surface to work increasing safety and making it easier to.
For many people out.
Pry up the old jack and remove it by pulling it up over the vent pipe.
This 1 2 tab has to be cut off where it hangs off the left edge of the gable roof.
Use a sturdy extension ladder that extends at least 3 feet above the eaves to climb onto the roof and secure the bottom to the foundation and the top to the eaves or fascia so it doesn t move.
Secure plank image zoom slip whichever size board usually a 2x8 inch or 2x10 inch will fit snugly into the jacks.
Butt a full shingle up against the cut shingle and nail into place.
Repeat this basic pattern alternating shingles across the roof working toward the right side using the chalk line to keep the shingles straight horizontally.
Lay the second row of shingles.
Use 4 nails per shingle and 6 nails on the prevailing windward sides of the roof as wind resistance nailing.
While some skylight manufacturers include flashing in their products sometimes roofing professionals have to create it or purchase it separately.