3 tongue and groove isn t always flat so you have to force the boards together to get them seated.
How to start 3 4 tongue and gtove siding.
Wide can be blind nailed with one casing nail per bearing toe nailed through the base of each tongue.
Install the plank with groove closest to the wall.
You can use your circular saw set to the depth of just the back part of the groove.
In horizontal application start at the bottom and work up with the grove edges facing downwards to assure a weather tight wall.
Tongue and groove siding can be installed horizontally or vertically.
Secure the first row by nailing into the tongue to the joist or furring strip and secure the groove side of the plank by face nailing into the joist.
Nails must penetrate 1 1 4 inches into solid wood.
With tongue and groove planks each piece has a side where there is a groove cut along the length of the board and a side where a tongue runs the length of the board.
Insert the nails into the tongue at an angle and use enough force to have the nail flush with the surface of the tongue.
Siding up to 6 in.
Installing tongue and groove walls can be a real workout.
Carefully slice the back part of the groove of your replacement board but leave the front part of the groove attached.
The fun with this kind of millwork is in the name.
We used 1 1 4 long 1 4 galvanized staples to install this cedar.
Wider siding should be face nailed using two nails per piece.
Siding up to 6 inches wide can be blind nailed with one siding nail per bearing toe nailed through the base of each tongue.
Nail up the first panel at a corner of the room with the tongue side facing out.
In order to provide a good nailing surface for vertically installed tongue and groove siding figure 1 the plywood sheathing underneath vertical siding should be thicker than that used for horizontal siding applications.
To install tongue and groove paneling vertically begin by nailing 1 by 3 furring strips horizontally either directly to the wall studs on a new wall or over the drywall on a finished wall.
1 you re usually working over your head.
Sheathing should be a minimum of 5 8 inch thick and 3 4 inch thick is even.
Insert your new board s tongue into your old board s groove and lay the new board s front groove over the other old board s tongue.
This is called blind nailing the only location that we installed fasteners in the face of the.
How to install vertical tongue and grove siding.
How to install tongue and groove siding.
When installing being by nailing one board to the top of the wall.
In horizontal application start at the bottom and work up with the groove edges facing downwards.
The paneling will be nailed directly to these furring strips.