Install the flashing before you finish the top of the brick wall as the flashing must go behind the siding as well as behind and under the top.
How to start vinyl siding above brick.
Slide the bottom row of panels into place making sure to hook the bottom lip of each panel under the starting strip.
It protects the sheathing from rain snow and pests.
If the transition exceeds 10 feet in.
Snap a level chalk line for the first starter strip at the base of the wall no less than 8 inches above ground level after determining the lowest corner of the house.
How it s done step 1.
We cover how to move doors and windows and create a weather proof exterior.
To provide a common reference point measure up 8 in.
Run the l shaped flashing up under the bottom row of siding so that it tucks under the final bottom.
Siding over brick exterior.
Mark the locations for your furring strips.
Not just another vinyl siding installation video.
Begin by installing the first row of siding on both sides of the deck.
This is where the new siding will begin.
Use the wider starter strip the bottom of the starter strip the part the bottom panel hooks on to should be at least 1 in.
Below the top of the foundation but the lower the vinyl siding is installed the better.
How to transition from brick to siding.
Following a metal flashing should it start from starter strip or j channel.
Vinyl siding starter strips.
I m thinking of installing vinyl siding above the brick wainscoting actually novabrik on our home.
Measure and mark the flashing to length with the measuring tape and a felt tip marker.
On the wall you ll need to mark the location you need for each.
Measure the length of the transition the intersection where the brick meets the face of the wall.
My detail only shows how it should be capped and flashed if you do build it as shown.
From the top of this row and stretch a string line across the deck.
Attach the strips to the wall.
Yes the proper detail is to fur out the siding over the face of the brick with at least a 4 overlap.
This chalk line should be level and a consistent distance from the eaves or the top and bottom of the windows.
Secure the panels with a nail every 16 inches 40 6 cm or so remembering to center the nail in slot and leave 1 16 of the nail head above the vinyl siding to allow for movement and expansion.
This is our most comprehensive.
Wear work gloves and cut.