Apply seamermate to end with drop and joint as instructed.
How to use rain gutter slip joint.
Measure carefully to determine the best location for the outlet fitting.
Apply a bead of caulk along one of the cracks.
Prepare a tube of exterior grade polyurethane caulk.
Wash the seam area of the gutter.
How to repair plastic gutter seams.
Cut a starter hole in the gutter with a chisel drill or sabre saw and nibble out the finished opening with tin snips.
Apply a bead of caulk along one of the cracks.
Set the ends of two lengths of gutter in the slip.
Simply squeeze into cracks and holes then apply a further coating around the entire gutter joint.
Cut a 45 degree opening on the nozzle of a silicone caulk tube by inserting the end of the nozzle in the hole located.
Measure and record the distance from the bottom of the fascia board to this nail.
To connect the gutter to the downspout use either an outlet or an end with drop.
For every 10 feet of gutter from this measurement and mark this distance at the low end of the gutter run.
How to install a slip joint on rain gutters step 1.
Measure the total run of the gutter length you need.
Clean the repair area to remove any grime or debris.
For the end with drop connect to the gutter with a seamer or slip joint connector.
For outside corners measure from corner to corner.
When installing gutters set the proper slope by driving a nail 1 2 in.
If you have a straight run gable roof measure from shingle to shingle and then add 1 2 inch to each side for a slight overlap.
If you have inside corners subtract 5 inches.
Then set the fitting on the bottom of the gutter and trace around it.
Below the shingles on the high side of the gutter run.
Place the top lip on the front of the slip.
Place the top lip of the slip joint s back over the top of the rear edge of the two gutter pieces.
Use the flange to mark the screwhole locations and bore 1 8 in holes through the gutter.
Pull the front edge of the slip joint connector away from the connector body to release the inner clamp.
More diy home improvement projects.