Now you can start to drill the holes for your rivets.
How tp rivet gutter seam.
After you have measured the rivets and chosen your drill bit to use don t start drilling quite yet.
How to connect two sections of gutters.
Use the flange to mark the screwhole locations and bore 1 8 in holes through the gutter.
Next use a chisel or some type of scraping tool and remove all of the old sealant.
Snap the joiners firmly into place.
If you aren t comfortable on a ladder don t get on one it s simply not worth it.
Cut a starter hole in the gutter with a chisel drill or sabre saw and nibble out the finished opening with tin snips.
You will first want to lay out your rivets onto the gutters.
First measure the total run of the gutter length needed.
Spread plastic cement on the edges of the gutter sections and the inside of the gutter joiner pieces.
It will be difficult to remove and quite stubborn but it all needs to go.
The first step is to gain access to the area in a safe and secure way.
When you do find a dislodged seam you need to take the two connected pieces apart at the joint where they are caulked together.
Attach the two pieces of gutter together and press firmly on the seam to ensure that the sealant is distributed evenly.
Then if you re measuring from an outside roof edge to an inside corner subtract 5 inches to leave room for the inside box miter.
Apply additional sealant inside the gutter at the seam pressing the sealant into the entire crevice.
For homeowners with a straight run gable roof measure shingle to shingle and add a inch to each of the sides for a slight overlap.
Project step by step 20 cutting the gutter.
Snap the sections together.
Set them very close to the place you are wanting them to be inserted into.
Pay special attention to the pop rivets or screws holding the pieces together.
Use the utility knife to cut through the sealant and then utilize the screwdriver to remove the screws.
It s much easier to join sections on the ground than to work from the top of a ladder.
Secure the pieces together with pop rivets.
If you have a straight run gable roof measure from shingle to shingle and then add.
Cut a two inch long notch in the front lip of the gutter with tin snips to join a rain gutter section.
Hang the gutter sections along the fascia with their ends touching together.
Clean seam edges and interior of gutter joiner pieces with rubbing alcohol.
Temporarily secure these rivets down with clamps.
Measure the total run of the gutter length you need.