If you have a sloped roof cut strips of roofing 9 inches wide position them flush with the drip edges along the eave and rake and attach them by driving two rows of nails that are about 3 inches apart.
How to install rolled roofing with nails.
How to apply roll roofing installation using the concealed nail method.
Make sure the roofing material is laying flat with no bumps or wrinkles attach the upper edge with the large head.
For hips and.
Add a second piece of full width roll roofing over the first.
Nail it in place with roofing nails that penetrate at least 3 4 inch into.
The valley of the roof is the point on the roof where the two sides meet.
Make sure that the roof is completely clean.
The base layer will need to be attached with nails to assure longevity of your roll roofing system.
As you work your way up.
The key to a tight roof is applying the roofing when it is warm enough for.
Using the exposed nail method.
Install each course of roofing like the concealed nail method.
Use a trowel to spread roofing cement over half or more of the strips.
Nail down the 18 inch roll roofing sheet that it is covering the valley.
Cover the valley of the roof.
How to nail down roll roofing step 1.
Step 6nail the first course match the overhang to the overhang of the starter strip 1 4 to 3 8 from the drip edge.
Make sure the rolled roofing is parallel to the eve of the roof.
The nails should start.
The nails should be inserted every 6 inches across the felt.
Nail the roofing in place with short roofing nails spaced 6 inches apart and 1 inch in from the outer edges of the roll roofing.